4.2. The order of the work

 

The integrated home system file is built up in steps and will contain both spreadsheets and drawings.

  • Place the consumer symbols on the floor plan and give them a code.
  • Place the sensor symbols on the floor plan and give them a code.
  • Draw up a consumer list.
  • Draw up a list of operating points and pushbuttons.
  • Draw up a single-line diagram.
  • Produce any other drawings and spreadsheets.

Log in to post comments

Follow us