Distribution panel in a modern Italian hotel room
By Stefan Fassbinder / Published on Fri, 2007-10-05 18:32How much energy does it cost to save energy? In this 4-star hotel each room is equipped with a distribution panel including an RCD (very good for electrical and fire safety) and a transformer 2*12V, rated no less than 24VA. Obviously the transformer supplies the door chime, some electronic control gear e. g. for the air conditioner, the electro-magnetic lock and the auto-shut-off: When the key card is removed the room lighting is switched off automatically in 2 groups with different time lags. This requires relays which also need to be powered, although 0.5W for each should suffice. The air condition control is also satisfied with 12V*40mA?0.5W. Still, the transformer is rather warm. This means that it is either highly loaded or over-dimensioned and made with a very poor quality magnetic steel so that it has excessive no-load losses. It is to be assumed that the high transformer power rating is only needed for fractions of a second to release the door lock when inserting the key card. For the rest of the day the bigger transformer causes higher losses; cheap design making losses 3 times as high as necessary, causing electricity costs as high as the price savings once every year.
The answer to this would have been a central 12V or 24V DC supply via remote power feeding, i. e. power through the data line. The short peak demand of the door magnet should then have been boosted by an electrolytic capacitor in order to avoid failure of the opening mechanism due to voltage drop along the long (relatively thin) data line. Not only would the energy efficiency of one (or a few) big feeding station(s) have been a great deal better but also the installation costs would have been lower than for the individual transformers, even though a filter might have become necessary to avoid signal absorption by the electrolytic capacitor. A small reactor connected in series with the electrolytic capacitor, with a reactance great enough to block the HF data signal but small enough not to hamper the power for the magnet, would have done the job and could have been accommodated in each room where now the transformer is or even in smaller piece numbers at somewhat greater intervals.
Tagged with
Rating
Related content
- - Investments in energy saving measures in Italy and UK: the impact of national support schemes
- - How much gross energy does a laptop or notebook PC actually use (part 2)?
- - Do PCs really have to make noise? The professional solution
- - Estimation of the energy losses of transformers at wind turbines
- - Thermal imaging of two buildings
People who read this also read
Popular content
- - Report - Renewables Support Schemes and Grid Integration Policies
- - Huge potential for energy savings: improved regulatory models for efficient investment and loss reduction in electricity network
- - Harmonics Impact Over Protection System of Power Generator
- - RETScreen Wins REEEP Funding for new MTV Tool
- - Energy master plan by OMA: North Sea super ring of wind farms
- - Report - Renewables Support Schemes and Grid Integration Policies
- - Chile – Renewable energy target attracts developers… even though there isn’t a green tariff
- - Research Priorities for Renewable Energy Technology by 2020 and Beyond
- - The cost development of wind energy
- - Are Zero Energy Buildings a Bridge too Far?