Replacement of existing wind turbines
By Hans De Keulenaer / Published on Wed, 2008-07-30 17:331 hour / Central European Time (Brussels, Paris, Berlin)
Walter Hulshorst, Fernando Nuno
In countries that started early with wind energy (Germany and Denmark), old wind turbines are often placed at locations where the wind is very good. Since the best locations for wind in these countries are occupied by old wind turbines with lower energy outputs compared with new wind turbines, programmes were started to replace the old turbines (5 up to 15 years old) with modern ones. With repowering, first-generation wind turbines can be replaced with modern multi-megawatt wind turbines.
The first-generation wind turbines can then be used in developing countries. Growing energy demand in developing countries stimulates the use of renewable energy sources, such as wind power, to provide a sustainable and environmentally-friendly power supply. For most of these countries, projects with new wind turbines have proven to be unaffordable: that is why using these lower-cost turbines may be an option.
This webinar summarises results of repowering programmes and used wind turbine projects.
View recording (45 minutes):
Tagged with
Related content
- - Effects of Ancillary Service Markets on Frequency and Voltage Control Performance of Deregulated Power Systems
- - Report - Repowering and Used Wind Turbines
- - Zero energy buildings - a good idea or over the cliff?
- - Is Grid Parity for Solar Electricity Imminent?
- - National Energy Efficiency Action Plans
People who read this also read
Popular content
- - Checklist for the electrical installation in the home
- - Report - Renewables Support Schemes and Grid Integration Policies
- - Virtual earthing electrode
- - What percentage of which car type (total 100%) do you expect in Europe in 2050? And ditto for 2020 and 2030?
- - Intelligent control of network-connected convertors







Comments
reader question
By Hans De Keulenaer / Published on Thu, 2008-10-09 9:31During the planning and building of a wind farm, two of the most difficult issues are
- obtaining planning permission and
- arranging grid connection.
When modifying a farm, especially when the height of the turbines is increased, revised planning permission will be needed and a higher connection capacity will be required. What is your experience on these issues so far?Reply
other questions received during the repowering webinar
By Hans De Keulenaer / Published on Sat, 2008-10-11 13:09Reply
answers to selected questions
By Walter Hulshorst / Published on Wed, 2008-10-22 11:38Reply
Repowering in Belgium
By Bruno De Wachter / Published on Tue, 2008-10-28 13:00During the seminar 'Strategic purchasing of green energy or producing in-house?' of the KVIV TI in Brussels two weeks ago, Alex Polfliet of Siemat Energy talked about the repowering of wind turbines in Belgium. He regretted that the Belgian regions have no regulatory framework in place for granting extra incentives to repowering projects, in contrast to countries like Germany and Spain. According to his figures, a repowering of all wind turbines in Belgium to 2 MW would double the wind capacity in this country.
Reply