Evolution of electrical design practice in office buildings
By Isabelle Heriakian / Published on Thu, 2008-04-03 20:28
Angelo Baggini, Franco Bua, Francesco Buratti
This paper summarises the outcomes of a European survey, aiming to evaluate typical office building electrical installation design practices in the years 2000 and 2005 in terms of adoption of Power Quality solutions.
A global installation model was built on a feeding model obtained by national market researchers on office buildings based on the Delphi approach. Interview results have been processed in order to define adoption frequencies of design issues solution covering the whole building electrical design.
The outcome of the survey showed a design practice modification in the examined period, which can be summarised as an increase in: reserve and emergency supply adoption, double radial scheme adoption, derating factor adoption for transformers, reactors and motors, high efficiency motors usage, neutral conductor oversizing, power monitoring equipments installation, plugs number and a TRMS approach for cable sizing.
Tagged with
Rating
Related content
- - Handbook of Power Quality
- - Guide for electrical design engineers
- - Chapter 3: permissible level of voltage fluctuations for a motor
- - Chapter 2 : Centralised Reactive Power Compensation
- - Dynamic Current Limitation to Provide Interactive Features of Power-Electronics Interfaced Distributed Generation
People who read this also read
Popular content
- - Checklist for the electrical installation in the home
- - Report - Renewables Support Schemes and Grid Integration Policies
- - Virtual earthing electrode
- - What percentage of which car type (total 100%) do you expect in Europe in 2050? And ditto for 2020 and 2030?
- - Intelligent control of network-connected convertors






