Skip to main content
The Global Community for Sustainable Energy Professionals
Search form
E-learning
Log in
Request an account
About Us
Find Resources
Energy blog
Community
Projects
Contact us
Front view
By:
Hans De Keulenaer
13/04/2007
Linkedin
Twitter
RSS
email
print
Rating:
0
No votes yet
Select rating
Give it 1/5
Give it 2/5
Give it 3/5
Give it 4/5
Give it 5/5
Your rating:
None
...
Quick navigation
-- Energy Technology
---- The Power of the Oceans - an eBook
------ AquaBuOY
-------- AquaBuOY prototype animation
------ Pico plant
-------- Turbine exhaust (“Bellmouth”) at rear of plant
-------- Exhaust of the relief valve in heavy sea
-------- Wave splashing over plant on an autumn day
-------- Front view
-------- Major components
-------- Interior of plant
------ Seawave Slot-Cone generator (SSG)
------ Wave Dragon
---- Underground High Voltage Cables: Wiring Europe for the Future
------ 1. Environmental Module
-------- 1.1. Electromagnetic Fields (EMFs)
-------- 1.2. Land issues
-------- 1.3. Recyclability
------ 2. Regulation
-------- 2.1. Basic mechanisms
-------- 2.2. Regulatory drivers
---------- EU Regulatory Environments for Power Transmission
---------- Financial Risks for Investors in Regulated Transmission Systems
---------- Overview of EU Transmission Regulation
---------- Regulatory regimes
---------- The Trans-European Energy Networks Programme
---------- Transmission Costs Across Europe
-------- 2.3. Investment Behaviour and the Cost of Project Delays
------ 3. Underground Cable Case Studies
-------- Case Study 1: Use of Cables in Areas of Outstanding Natural Beauty
-------- Case Study 2: Cables Enable Development of Valuable Project at Madrid Airport
-------- Case Study 3: How Protests Can Delay Overhead Line Projects
-------- Case Study 4: Cables Enable Reinforcement of the Grid in a Built-Up Area
-------- Case Study 5: Building a Business Case for Power Projects in Sweden
---------- How Transmission Systems Deal with Failures
------ 4. System Reliability
-------- 4.1. Reliability of Cables and Lines
---------- How Transmission Systems Deal with Failures
---------- The N-1 criterion for power transmission
-------- 4.2. Failure Case Studies and Correction
---------- Case Studies and Impacts
---------- Failure Statistics for Overhead Lines and Underground Cables
---------- Storm, Weather Damage and Accidents
-------- 4.3. Technical Improvement
---------- Detecting faults
---------- Installation
---------- Maintenance
-------- 4.4. Testing and Development
---------- Pictures of Testing Facilities
---------- Testing Standards
------ 5. Life Cycle Module
-------- 5.1. Installation Costs
---------- Relative Cost Figures
---------- Relative Costs When Life Cycle Issues are Included
-------- 5.2. Transmission Losses
-------- 5.3. Planning Delays
---------- Delaying Wind Power in the UK
-------- 5.4. Replacement Cycles
Previous chapter
Wave splashing over plant on an autumn day
Next chapter
Major components
Back to resources
Log in
to post comments
About us
Presentation
How to use this site?
Partners
Become a partner
Find resources
Energy blog
Projects
E-learning
Community
Log in
Request an account
Contact us
Follow us
Subscribe to our mailing list and stay up-to-date
*