A new classification for Power Quality requirements (@ POC)
By Isabelle Heriakian / Published on Wed, 2008-04-09 16:41In order to clearly identify responsibilities for voltage quality disturbances on the point of connection (POC), voltage and current requirements have to be available at the POC. So, the relationship between inrush currents, flicker severity levels and grid impedances in the low voltage grid should be explained.
Furthermore, maximum harmonic currents at the POC in low voltage grids are determined by using these grid impedances.
J Cobben explains how he and his team developed a very simple ABCDEF classification to help everybody by having a common tool with which to assess power quality requirements.
Tagged with
Rating
Related content
- - Power quality cost : a practical approach
- - New Power Quality Solutions For Industrial Applications
- - Creating a regulatory framework for power quality
- - Multiple Power Quality Supply System 1st field experience in Japan
- - AGH Krakow Poland explores future trends in Energy & Power Quality Education
People who read this also read
Popular content
- - Checklist for the electrical installation in the home
- - Report - Renewables Support Schemes and Grid Integration Policies
- - Virtual earthing electrode
- - What percentage of which car type (total 100%) do you expect in Europe in 2050? And ditto for 2020 and 2030?
- - Intelligent control of network-connected convertors






