ECI’s PQ Survey demonstrates that the majority of the PQ problems faced by the hotel sector could be avoided by a more adequate design of the hotels’ own electrical installations.
The solutions therefore lie very much in the business’ own hands.
Electrical design engineers involved in this survey recommend a holistic approach to review all the issues at hand, based on three operational pillars: